Go/NoGo 3 – Philae ready

November 12, 2014
The Philae Control Team at the Lander Control Centre (DLR/Cologne) have completed a final check and verification of the lander’s health.

The GO was given at 02:35 GMT/ 03:35 CET.

Following a short manoeuvre set for 06:30 UTC / 07:30 CET, the final GO for separation will be made around 07:35 UTC/08:35 CET.